IMPORTANT — DO NOT APPLY POWER to the UPS, emergency lighting inverter,
power conditioner, or auxiliary equipment prior to arrival of the Staco service technician.
Applying power before authorized start-up may void the system warranty and create a safety hazard.
Input supply should remain OFF until the technician approves the source.
Thank you for choosing Staco Energy Products. A factory-trained technician will
provide on-site start-up once equipment has been installed by you or your contractor.
Service includes installation inspection, system activation, performance verification,
warranty validation (where applicable), and basic operator training.
Questions?
866-261-1191 (toll-free) ·
937-253-1191 ·
service@stacoenergy.com ·
Fax: 937-253-1723
Request prepared
Your email client should open with a message to
service@stacoenergy.com. Please review, attach any files, and send.
If email did not open, copy the summary below and send it manually.